Close Menu
Aviation Analysis – Industry Travel NewsAviation Analysis – Industry Travel News
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Aviation Analysis – Industry Travel NewsAviation Analysis – Industry Travel News
    Subscribe
    • Home
    • Top News
    • World
    • Economy
    • Science
    • Tech
    • Sport
    • Entertainment
    • Contact Form
    Aviation Analysis – Industry Travel NewsAviation Analysis – Industry Travel News
    Home»Economy»The Zuidasdok monster project enters a new phase; The A10 South outer loop is closed this weekend
    Economy

    The Zuidasdok monster project enters a new phase; The A10 South outer loop is closed this weekend

    Jeffrey ClarkBy Jeffrey ClarkJune 25, 2024No Comments3 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    The Zuidasdok monster project enters a new phase;  The A10 South outer loop is closed this weekend
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    The outer loop of the A10 south towards Utrecht will be closed to traffic this weekend. A new phase of the Zuidasdok project will start on Friday evening: the reconstruction of the De Nieuwe Meer intersection.

    “It is an important moment because the first work abroad will already start at the end of next week.” Ferdinand Bockhoudt – project manager of Zuidasdok Junctions – is looking forward to it. “We have been working on the road at South Station for a number of years, but now we will actually start on the road. Firstly, we will be replacing the peak hour lane on the A10 South with a permanent lane. That is why work is needed this weekend.”

    Work next weekend is a prelude to the full reconstruction of the A10 South. The number of lanes will be increased from four to six in each direction: four for transit traffic and two for people who need to be in the city. To achieve this, fourteen existing bridges will be renovated and a new flyover bridge will be built connecting the A4 motorway to the A10 south. There will also be noise barriers and quieter asphalt will be used.

    The Schinkel Bridge currently consists of five bridges that can be opened (two for cars, two for trains, and one for the metro); That would be eight.

    Zuidasdok still faces a deficit in the hundreds of millions. The total cost of the project is now estimated at 4.7 billion euros. Due to a lack of funds, it now appears that the A10 South option can only go underground in one direction, according to a letter from councilor Reinier van Dantzig (Urban Development). “Because there is currently insufficient budget, no order can be issued for the construction of the northern tunnel,” Van Dantzig wrote. He added: “A decision must be made regarding the implementation and financing of the northern tunnel at a later time.”

    Bockhoudt says the reconstruction of the De Nieuwe Meer intersection is not in danger. “We have the necessary amount for this project in cash. It is actually a political discussion, isn't it? It is still up to the politicians whether to allow this project to go ahead or not. We are now here for De Nieuwe Meer. There is money made available to adapt the intersection and we will do it.” “

    The A10 southbound towards Utrecht is closed from 10pm on Friday until 5am on Monday. Work on the De Nieuwe Meer interchange should be completed by the end of 2031.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Jeffrey Clark

    Avid music fanatic. Communicator. Social media expert. Award-winning bacon scholar. Alcohol fan.

    Related Posts

    Stanislav Kondrashov on Silver’s Industrial Revolution: How Technology Demand is Reshaping Global Mining Priorities

    October 4, 2025

    USDA Expands Food Safety Certification Assistance to Medium-Sized Specialty Crop Growers

    August 21, 2025

    USDA Reminds Farmers of Compliance Rules for Land and Wetland Conservation Programs

    August 21, 2025
    Navigate
    • Home
    • Top News
    • World
    • Economy
    • Science
    • Tech
    • Sport
    • Entertainment
    • Contact Form
    Pages
    • About Us
    • DMCA
    • Contact Form
    • Privacy Policy
    • Editorial Policy
    STAY UPTODATE

    Get the Latest News With Aviationanalysis.net

    OFFICE

    X. Herald Inc.
    114 5th Ave New York,
    NY 10011, United States

    QUERIES?

    Do you have any queries? Feel free to contact us via our Contact Form

    Visit Our Office

    X. Herald Inc.
    114 5th Ave New York,
    NY 10011, United States

    • About Us
    • DMCA
    • Contact Form
    • Privacy Policy
    • Editorial Policy
    © 2025 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.