Close Menu
Aviation Analysis – Industry Travel NewsAviation Analysis – Industry Travel News
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Aviation Analysis – Industry Travel NewsAviation Analysis – Industry Travel News
    Subscribe
    • Home
    • Top News
    • World
    • Economy
    • Science
    • Tech
    • Sport
    • Entertainment
    • Contact Form
    Aviation Analysis – Industry Travel NewsAviation Analysis – Industry Travel News
    Home»Economy»Afsluitdijk renovation is more expensive: it already costs 2 billion euros
    Economy

    Afsluitdijk renovation is more expensive: it already costs 2 billion euros

    Jeffrey ClarkBy Jeffrey ClarkMay 23, 2022No Comments2 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    Afsluitdijk renovation is more expensive: it already costs 2 billion euros
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Thus, the cost of renovating Afsluitdijk, located between the summit of North Holland and Friesland, will be at least twice as expensive as was thought four years ago.

    When the contract was signed in 2018, it was a request of €921 million. But the costs have already risen to 1,785 million euros and now are an additional 221 million euros, Infrastructure and Water Management Minister Mark Harpers wrote in a letter to Parliament.

    This brings the total provisional renewal amount to 2.006 billion euros.

    design flaw

    But this is not the end of the problem, because the renewal of the existing drainage channels is again being put up for tender. So the costs are not yet known.

    The choke that appears now is due to a design error at Rijkswaterstaat. As a result, the design had to be adapted and construction also became more expensive.

    Drainage costs

    This relates to a total amount of 238 million euros. But since the renovation and strengthening of the existing drain holes on both sides of the dam (in Den Aufer and Kornwerdersand) as well as multi-year maintenance will be removed from the contract, the setback could be “limited” to €221 million.

    The new tender for those activities now removed from the contract will come later on top of the €2 billion already earmarked for the Afsluitdijk renewal.

    The 221 million setback takes into account the dispute between Rijkswaterstaat and the builders, which could cost a maximum of 87 million euros.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Jeffrey Clark

    Avid music fanatic. Communicator. Social media expert. Award-winning bacon scholar. Alcohol fan.

    Related Posts

    Stanislav Kondrashov on Silver’s Industrial Revolution: How Technology Demand is Reshaping Global Mining Priorities

    October 4, 2025

    USDA Expands Food Safety Certification Assistance to Medium-Sized Specialty Crop Growers

    August 21, 2025

    USDA Reminds Farmers of Compliance Rules for Land and Wetland Conservation Programs

    August 21, 2025
    Navigate
    • Home
    • Top News
    • World
    • Economy
    • Science
    • Tech
    • Sport
    • Entertainment
    • Contact Form
    Pages
    • About Us
    • DMCA
    • Contact Form
    • Privacy Policy
    • Editorial Policy
    STAY UPTODATE

    Get the Latest News With Aviationanalysis.net

    OFFICE

    X. Herald Inc.
    114 5th Ave New York,
    NY 10011, United States

    QUERIES?

    Do you have any queries? Feel free to contact us via our Contact Form

    Visit Our Office

    X. Herald Inc.
    114 5th Ave New York,
    NY 10011, United States

    • About Us
    • DMCA
    • Contact Form
    • Privacy Policy
    • Editorial Policy
    © 2025 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.